How is a programme run?

Eight stages, each with an owner and a gate.

What happens to an order between the quotation and the shipment: who owns each stage, what it starts from, the approval that releases it, what has to pass before work moves on, and what is handed over.

Who owns what, and when it moves.

Each stage sits in the lane of the role that owns it. The line is the chain of handoffs: it changes lane where ownership changes hands, and it passes an approval and a quality gate on the way out of every stage. Select a stage for its detail.

  • Stage, in its owner's lane
  • Approval point
  • Quality gate

Stage 01 of 08

Order

OwnerMerchandiser, named for the programme

Starts from
  • Enquiry with tech pack, sketch or reference
  • Target quantity and delivery window
  • Labelling, packing and documentation requirements
  • Your NDA, where you send one
Approval point
Quotation agreed, with the sampling schedule set against it.
Quality gate
Brief checked for completeness: every open question listed and put to you before development starts.
Hands over
A programme brief, passed to design and development.Next: Development

Stage 02 of 08

Development

OwnerDesign and development, led by the Creative Director, with the pattern master

Starts from
  • Programme brief
  • Tech pack or reference
  • Fabric and trim options
Approval point
Fabric, trims and colour direction chosen from the options proposed.
Quality gate
No sample goes out unmeasured.
Hands over
Proto and fit samples, sent to you through the merchandiser.Next: Approval
A designer at Donear checking a fabric swatch against a weave design sheet

A designer at Donear checking a fabric swatch against a weave design sheet. Partner photograph.

Stage 03 of 08

Approval

OwnerMerchandiser, with you

Starts from
  • Fit comments
  • Revised samples
  • Counter sample in bulk fabric and trims
Approval point
Fit, fabric and finish signed off on the counter sample.
Quality gate
The counter sample checked against every approved comment before it is signed off.
Hands over
The approved sample and the graded pattern, released to production as the reference.Next: Fabric
A colourist at Donear studying a wall of fabric shade cards

A colourist at Donear studying a wall of fabric shade cards. Partner photograph.

Stage 04 of 08

Fabric

OwnerMerchandiser

Starts from
  • Approved fabric quality and shade
  • Trim card
  • Bulk quantities from the cut plan
Approval point
Bulk fabric and trims approved against the sample, the fabric dyed to the approved shade before cutting.
Quality gate
Bulk fabric and trims checked against the approved sample for shade, hand and width before release.
Hands over
Bulk fabric and trims, released to cutting.Next: Production
A power loom at Donear, one of our fabric mills, weaving fabric onto the cloth beam

A power loom at Donear, one of our fabric mills, weaving fabric onto the cloth beam. Partner photograph.

Stage 05 of 08

Production

OwnerProduction floor; technical questions to the Technical Head

Starts from
  • Approved sample and graded pattern
  • Released fabric and trims
  • Cut plan by size and colour
Approval point
Line set up against the approved sample, pattern and trims before stitching starts.
Quality gate
In-line and end-line inspection.
Hands over
Finished garments, passed to final inspection.Next: Quality
Our own stitching floor: rows of industrial sewing machines with thread cones

Our own stitching floor: rows of industrial sewing machines with thread cones.

Stage 06 of 08

Quality

OwnerQA department, led by the QA Head

Starts from
  • Finished lot
  • Agreed AQL and specification
  • Approved sample
Approval point
Lot accepted against the agreed AQL; your own or a third-party inspection where the programme requires one.
Quality gate
Final random inspection before dispatch.
Hands over
The passed lot, released to packing with its inspection result.Next: Packing
A hand holding a tape measure at the shoulder seam of a pale blue woven shirt, measuring down the sleeve

A hand holding a tape measure at the shoulder seam of a pale blue woven shirt, measuring down the sleeve. Representative photograph.

Stage 07 of 08

Packing

OwnerFinishing and packing

Starts from
  • Passed garments
  • Packing and labelling specification
  • Size ratio per carton
Approval point
Labels, tags and carton marks match your specification.
Quality gate
Packing check passed.
Hands over
Marked cartons and a packing list, passed to dispatch.Next: Dispatch
Taped corrugated cartons stacked on a shelf

Taped corrugated cartons stacked on a shelf. Representative photograph.

Stage 08 of 08

Dispatch

OwnerMerchandiser

Starts from
  • Packed cartons and packing list
  • Shipping terms
  • Document requirements
Approval point
Shipment details and documents confirmed with you as agreed for the programme.
Quality gate
Documents checked against the cartons and the packing list before handover.
Hands over
Goods delivered within India, or the export shipment handed over with its documents.

Operating maturity

Not just machines. A system.

The disciplines that hold the stages together from order to dispatch, each set beside the fact on this site that shows it.

  1. 01

    Programme management

    Each order is run as a programme: one brief, one approved reference, one schedule, and capacity allocated to it before bulk starts.

    Shown byCapacity confirmed per programme.

    Parallel capacity
  2. 02

    Quality gates

    Work does not move to the next stage until it has passed the check at the end of the current one.

    Shown byMeasurement and fit audits.

    The checkpoints
  3. 03

    Approvals

    Fit, fabric, colour, trims and value addition are each approved on a physical sample before bulk, and the approved sample is the reference from then on.

    Shown byCounter-sample approval cycle.

    The sampling journey
  4. 04

    Documentation

    Each programme carries its own paper trail: the specification, the approvals, the inspection results, the packing list and the shipping documents. Compliance paperwork is prepared for your onboarding.

    Shown byShared, not published.

  5. 05

    Buyer communication

    Questions, comments and revisions run through one person, so nothing is lost between your team and the floor.

    Shown byOne named point of contact.

    What happens after you contact us
  6. 06

    Production tracking

    Because the route does not change, progress is reported as the stage each style has reached, and a delay shows at the stage where it starts.

    Shown byTen stages, in order: Enquiry, Sampling, Fabric, Dyeing, Cutting, Value addition, Stitching, Quality control, Packing, Dispatch.

  7. 07

    Packing

    Packing follows your instruction to the carton: fold, labels, ratios and marks, checked against the packing list.

    Shown byCarton marking and packing lists.

    Packing & dispatch
  8. 08

    Dispatch

    Nothing leaves the floor without its packing list and the documents agreed for the shipment.

    Shown byDomestic dispatch and export documentation.