How are many styles kept moving at once?

How retail programmes are managed

A retail programme is many styles, colours, sizes and deliveries moving at once. Managing it comes down to owners, gates and one reference for every decision.

Anmol JournalGuide

Guide 8 of 10

Topic
Programmes
Reading time
2 minutes
Sections
05
Figures
02

01A programme, not an order

Retailers buy in programmes: a group of styles planned together for a season or a delivery drop, each in several colours and sizes, often with staggered deliveries. The work is less about one garment than about keeping many moving in step.

That is why the first questions are about the whole: how many styles, which fabrics they share, and which delivery each one belongs to.

02One named owner

With us, each programme has one named merchandiser who owns the communication: one place for specifications, revisions and approvals, and one person who knows the whole programme.

Behind that person, design, production, partner units and QA each own their stage. The merchandiser's work is the handoffs between them.

Fig. 01Programme stages, owners and approval points

  1. 01

    Order

    Merchandiser
  2. 02

    Development

    Design and development
  3. 03

    Approval

    Merchandiser
  4. 04

    Fabric

    Merchandiser
  5. 05

    Production

    Production floor
  6. 06

    Quality

    QA department
  7. 07

    Packing

    Finishing and packing
  8. 08

    Dispatch

    Merchandiser
Order to dispatch: who owns each stage, and where the approvals sit.Approval points, handoffs and quality gates for every stage

03Gates, not guesses

A well-run programme moves through gates: the quotation, the approved counter sample, approved bulk fabric, the inspection result. A stage does not start until the gate before it has been passed and recorded.

Gates make a programme visible. At any moment it is clear which gate each style has passed and what it is waiting for.

04Capacity against the calendar

Capacity is planned against the delivery window, style by style. A large programme can run on several lines in parallel, on our Bhiwandi floor and at partner units, rather than queueing on one.

A plan is only as good as the dates feeding it, so fabric, trims and approvals are tracked against the same calendar as the lines.

A stage does not start until the gate before it has been passed and recorded.

05The retailer's rules

Every retailer has its own labelling, ticketing, packing and documentation rules, often gathered in a vendor manual. Treating them as part of the specification from the quotation onwards avoids the most avoidable delay in retail: goods that are ready but cannot be packed.

A vendor manual shared with the enquiry can be costed into the quotation, instead of being discovered at packing.

Taped corrugated cartons stacked on a shelf
Fig. 02Taped cartons, packed and ready for dispatch. Representative photograph.